Hu Jinhua, Wang Xiangming. A method for estimating the extreme 10-minute average and 3-second wind speed with a recurrence period of 50 years at the different height in a wind farm. J Appl Meteor Sci, 2009, 20(1): 108-113.
Citation: Hu Jinhua, Wang Xiangming. A method for estimating the extreme 10-minute average and 3-second wind speed with a recurrence period of 50 years at the different height in a wind farm. J Appl Meteor Sci, 2009, 20(1): 108-113.

A Method for Estimating the Extreme 10-minute Average and 3-second Wind Speed with a Recurrence Period of 50 Years at the Different Height in a Wind Farm

  • Received Date: 2008-04-08
  • Rev Recd Date: 2008-07-16
  • Publish Date: 2009-02-28
  • The extreme 10 minute average and 3 second wind speed with a recurrence period of 50 years at the hub height on a wind farm is a major index for choosing the wind turbines types. From the viewpoint of meteorology, and linking some developed examples of the wind farm projects in China, the article brings forward a sampling method of the maximum 10 minute average wind speed of 5 days from a whole year actual measured wind speed data of a mast at the wind farm. The method refers to the typeⅠ extreme value distribution and the modification matrix estimating the parameters method, for estimating the extreme 10 minute average wind speed with a recurrence period of 50 years at different heights in a wind farm. Using the same period and long term wind speed data of a nearby meteorological station, the above results can be revised. Since the distribution of wind resource has its own specialty in China, the maximum gust coefficient is reduced when the wind speed gets larger in north area of China, and is bigger than 1.4 when the wind farm is influenced by tropical storm or typhoon. It suggests that using the actual observed maximum gust coefficient of the bigger wind speed to estimate the extreme 3 second wind speed with a recurrence period of 50 years at different heights in a wind farm. This method is applied to estimate the extreme 10 minute average and 3 second wind speed with a recurrence period of 50 years at the different heights in the Wulanyiligeng wind farm 300 MW project in Bayannaoer City, Inner Mongolia. The result reveals that the method is convenient and reliable for the Wulanyiligeng wind farm projects developing.
  • Table  1  Sampling maximum wind speed of 5 days, estimating the extreme 10-minute average wind speed with a recurrence of 50 years at different height of wind farm

    Table  2  The accuracy test of the estimating method of 5 days maximum wind speed sampling at Wulanyiligeng wind farm

    Table  3  The measured maximum 10-minute and 3-second wind speed at 9010# mast on March 30, 2007(unit : m·s-1)

    Table  4  The measured gust coefficient at 9010# mast varying with the wind speed and the height

    Table  5  The extreme 10-minute and 3-second average wind speed with a recurrence of 50 years at different height of Wulanyiligeng wind farm

  • [1]
    International Electrotechnical Commission. International Standard IEC61400-1:2005. 2005.
    [2]
    全国风能资源评价技术规定.http://www.windpower.org.cn/news/links/js_2005_0513_2.htm.
    [3]
    杨振斌, 薛桁, 桑建国.复杂地形风能资源评估研究初探.太阳能学报, 2004, 25(6):744-749. http://www.cnki.com.cn/Article/CJFDTOTAL-TYLX200406005.htm
    [4]
    李鸿秀, 任鹏, 朱瑞兆.关于风能资源评估中最大风速的探讨.第四届亚洲风能大会暨国际风能设备展览会会议论文, 2007.
    [5]
    林凤羽.输电线路的风荷载.电网技术, 1993(6):34-38. http://mall.cnki.net/magazine/Article/DWJS199306007.htm
    [6]
    Van den Brink H W, Kormen G P, Opsteegh J D. Statistics of Extreme Synoptic-scale Wind Speeds in Ensemble Simulations of Current and Future Climate. Royal Netherlands Meteorological Institute. www.knmi.nl/publications/fulltexts/pap_brink200302.pdf.
    [7]
    段忠东, 欧进萍, 周道成.极值风速的最优概率模型.土木工程学报, 2002, 35(5):11-16. http://www.cnki.com.cn/Article/CJFDTOTAL-TMGC200205002.htm
    [8]
    Smits Ilia. Estimation of Extreme Return Levels of Wind Speed: A Modification of Rijkoort-Weibull Model.http://www.knmi.nl/samenw/hydra/documents/index.html, June 6, 2001.
    [9]
    贺德馨.风工程与工业空气动力学.北京:国防工业出版社, 2004.
    [10]
    陈正洪, 向玉春, 杨宏青.深圳湾公路大桥设计风速的推算.应用气象学报, 2004, 15(2):226-233. http://qk.cams.cma.gov.cn/jams/ch/reader/view_abstract.aspx?file_no=20040229&flag=1
    [11]
    薛桁, 朱瑞兆.我国北部草原地区近地层平均风特性分析.太阳能学报, 1992, 13(3):232-238. http://www.cnki.com.cn/Article/CJFDTOTAL-TYLX199203003.htm
    [12]
    包能胜, 刘军峰, 倪维斗, 叶枝全.新疆达坂城风电场风能资源特性分析.太阳能学报, 2006, 27(11):1073-1077. http://www.cnki.com.cn/Article/CJFDTOTAL-TYLX200611000.htm
    [13]
    赵林, 葛耀君, 项海帆.极值风速拟合优化策略.同济大学学报, 2003, 31(4):383-388. http://www.cnki.com.cn/Article/CJFDTOTAL-TJDZ200304003.htm
    [14]
    陈朝晖, 管前乾.基于短期资料的重庆风速极值渐进分布分析.重庆大学学报, 2006, 29(12):88-92. http://www.cnki.com.cn/Article/CJFDTOTAL-FIVE200612022.htm